National Assembly For Wales

Description

M&P were specifically brought in by Ardmac Interior Contracting in a partnering relationship due to our experience of delivering detailed  and fast track Projects. M&P’s experience delivered a complex Project on time and within budget.
The project was intensely detailed and included thousands of metres of fire/acoustic baffles both above the partition ceiling voids and below the raised floor voids.

M&P Scope of works

Metal Stud Partitions, Dry lining, Demountable Partitions,  MF Ceilings, Feature Ceilings and Acoustic Baffles.

Project details

  • Main Contractor Shepherd Construction
  • Building Type National Assembly for Wales
  • M&P Value £250,000
  • Start and completion date 1992-1993